1J
Generator Removal and Installation
Removal
1) Disconnect negative (–) cable (2) at battery (1).
2) Remove bolts (2) and then canister (1) together withe its bracket.
3) Disconnect “B” terminal wire (3) and coupler (2) from generator (1).
4) Remove generator belt. Refer to Water Pump Belt Removal and Installation:M13A .
5) Remove generator.
Installation
1) Install generator on the generator bracket.
2) Tighten generator bolts.
Tightening torque
Generator pivot bolt ( a ): 23 N·m ( 2.3 kg-m, 16.5 lb-ft)
( b ): 50 N·m ( 5.0 kg-m, 36.0 lb-ft)
3) Install generator (cooling fan) belt. Refer to Water Pump Belt Removal and Installation:M13A .
4) Connect “B” terminal wire (3) and coupler to generator.
Tightening torque
“B” terminal outer nut of generator ( b ): 8.0 N·m ( 0.8 kg-m, 6.0 lb-ft)
5) Install canister.
6) Connect negative (–) cable at battery.