1G
Fuel Cut Operation Inspection
NOTE:
Before inspection, check to make sure that gear shift lever is in neutral position (with A/T model, selector lever in “P” range), A/C is OFF and that parking brake lever is pulled all the way up.
1)
Warm up engine to normal operating temperature.
2)
While listening to sound of injector (2) by using sound scope (1) or such, increase engine speed to higher than 3,000 r/min.
3)
Check to make sure that sound to indicate operation of injector stops when throttle valve is closed instantly and it is heard again when engine speed is reduced to less than about 2,000 r/min.